<?xml version='1.0' encoding='utf-8'?>
<?xml-stylesheet type="text/xsl" href="/v2/static/oai2.xsl"?>
<OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd">
  <responseDate>2026-10-06T13:06:27Z</responseDate>
  <request identifier="oai:figshare.com:article/34023279" metadataPrefix="oai_dc" verb="GetRecord">https://api.figshare.com/v2/oai</request>
  <GetRecord>
    <record>
      <header>
        <identifier>oai:figshare.com:article/34023279</identifier>
        <datestamp>2026-10-01T14:09:27Z</datestamp>
        <setSpec>category_24928</setSpec>
        <setSpec>category_24967</setSpec>
        <setSpec>category_26374</setSpec>
        <setSpec>category_27283</setSpec>
        <setSpec>category_27289</setSpec>
        <setSpec>portal_759</setSpec>
        <setSpec>item_type_1</setSpec>
        <setSpec>month_year_10_2026</setSpec>
      </header>
      <metadata>
        <oai_dc:dc xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"  xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:dc="http://purl.org/dc/elements/1.1/" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
          <dc:title>Workers fixing the base timber</dc:title>
          <dc:creator>Kevellin Aquino (25089178)</dc:creator>
          <dc:subject>Sustainable architecture</dc:subject>
          <dc:subject>Design anthropology</dc:subject>
          <dc:subject>Timber engineering</dc:subject>
          <dc:subject>Critical heritage, museum and archive studies</dc:subject>
          <dc:subject>Digital heritage</dc:subject>
          <dc:subject>Wooden architecture</dc:subject>
          <dc:subject>traditional construction</dc:subject>
          <dc:subject>community filmmaking</dc:subject>
          <dc:description>Documentation of the construction process of the Oga Pysy foundations, made with tajy and urunde'y wood. This stage is essential to ensure longevity and durability of the structure, as it allows the bamboo to be secured without direct contact with the ground, preventing termite activity and bamboo decay.</dc:description>
          <dc:date>2026-10-01T14:09:27Z</dc:date>
          <dc:type>Image</dc:type>
          <dc:type>Figure</dc:type>
          <dc:identifier>10.25420/britishmuseum.34023279.v1</dc:identifier>
          <dc:relation>https://figshare.com/articles/figure/Workers_fixing_the_base_timber/34023279</dc:relation>
          <dc:rights>CC BY-NC-SA 4.0</dc:rights>
        </oai_dc:dc>
      </metadata>
    </record>
  </GetRecord>
</OAI-PMH>
