<?xml version='1.0' encoding='utf-8'?>
<?xml-stylesheet type="text/xsl" href="/v2/static/oai2.xsl"?>
<OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd">
  <responseDate>2026-10-06T07:29:10Z</responseDate>
  <request identifier="oai:figshare.com:article/33981580" metadataPrefix="oai_dc" verb="GetRecord">https://api.figshare.com/v2/oai</request>
  <GetRecord>
    <record>
      <header>
        <identifier>oai:figshare.com:article/33981580</identifier>
        <datestamp>2026-10-01T14:02:32Z</datestamp>
        <setSpec>category_24928</setSpec>
        <setSpec>category_24967</setSpec>
        <setSpec>category_26374</setSpec>
        <setSpec>category_27283</setSpec>
        <setSpec>category_27289</setSpec>
        <setSpec>portal_759</setSpec>
        <setSpec>item_type_2</setSpec>
        <setSpec>month_year_10_2026</setSpec>
      </header>
      <metadata>
        <oai_dc:dc xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"  xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:dc="http://purl.org/dc/elements/1.1/" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
          <dc:title>Removing the earth for transport</dc:title>
          <dc:creator>Luan Iturve Rodrigues (25089118)</dc:creator>
          <dc:subject>Sustainable architecture</dc:subject>
          <dc:subject>Design anthropology</dc:subject>
          <dc:subject>Timber engineering</dc:subject>
          <dc:subject>Critical heritage, museum and archive studies</dc:subject>
          <dc:subject>Digital heritage</dc:subject>
          <dc:subject>Digging</dc:subject>
          <dc:subject>pillars</dc:subject>
          <dc:subject>foundations</dc:subject>
          <dc:subject>traditional construction</dc:subject>
          <dc:description>Documentation of the process of digging holes for placing the pillars of the Oga pysy. The measurements of the pillars and the holes dug in the ground are precisely calculated according to the intended height of the house. It is therefore important that the holes are measured and tested before securing the pillars in the ground, ensuring proper alignment and structural stability of the Oga Pysy when raising the building.</dc:description>
          <dc:date>2026-10-01T14:02:32Z</dc:date>
          <dc:type>Dataset</dc:type>
          <dc:type>Media</dc:type>
          <dc:identifier>10.25420/britishmuseum.33981580.v1</dc:identifier>
          <dc:relation>https://figshare.com/articles/media/Removing_the_earth_for_transport/33981580</dc:relation>
          <dc:rights>CC BY-NC-SA 4.0</dc:rights>
        </oai_dc:dc>
      </metadata>
    </record>
  </GetRecord>
</OAI-PMH>
