<?xml version='1.0' encoding='utf-8'?>
<?xml-stylesheet type="text/xsl" href="/v2/static/oai2.xsl"?>
<OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd">
  <responseDate>2026-10-14T05:49:45Z</responseDate>
  <request identifier="oai:figshare.com:article/33833653" metadataPrefix="oai_dc" verb="GetRecord">https://api.figshare.com/v2/oai</request>
  <GetRecord>
    <record>
      <header>
        <identifier>oai:figshare.com:article/33833653</identifier>
        <datestamp>2026-09-16T08:30:29Z</datestamp>
        <setSpec>category_26353</setSpec>
        <setSpec>item_type_3</setSpec>
        <setSpec>month_year_09_2026</setSpec>
      </header>
      <metadata>
        <oai_dc:dc xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"  xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:dc="http://purl.org/dc/elements/1.1/" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
          <dc:title>AWWA C200 Welded Steel Water Pipe Submittal and Inspection Register Pack</dc:title>
          <dc:creator>Chuck Yu (24965767)</dc:creator>
          <dc:subject>Construction engineering</dc:subject>
          <dc:subject>AWWA C200</dc:subject>
          <dc:subject>welded steel water pipe</dc:subject>
          <dc:subject>submittal register</dc:subject>
          <dc:subject>inspection and test plan</dc:subject>
          <dc:subject>hydrostatic test</dc:subject>
          <dc:subject>NDT</dc:subject>
          <dc:subject>coating inspection</dc:subject>
          <dc:subject>NCR closeout</dc:subject>
          <dc:subject>procurement</dc:subject>
          <dc:description>&lt;p dir="ltr"&gt;Six editable procurement and quality-control registers for organizing approval-stage and final manufacturing evidence for welded steel water pipe packages. The pack covers the master submittal register, inspection and test plan stages, hydrostatic-test record fields, NDT record fields, coating and lining submittals, and deviation/NCR closeout.

The files define record categories rather than universal acceptance criteria. Before project use, add the governing specification, drawing revision, selected standard and edition, review status, responsible party, due date, and document reference.

Buyer-facing context and the relationship between the AWWA C200 family documents are explained in Forever Steel's AWWA C200 related steel water pipe standards and submittal package: https://www.forever-steels.com/news-detail/awwa-c200-related-steel-water-pipe-standards

Prepared by Chuck Yu, Forever Steel Manufacturing Co., Ltd. This is supplier-authored procurement guidance and does not replace the contract documents or licensed standards.&lt;/p&gt;</dc:description>
          <dc:date>2026-09-16T08:30:29Z</dc:date>
          <dc:type>Dataset</dc:type>
          <dc:type>Dataset</dc:type>
          <dc:identifier>10.6084/m9.figshare.33833653.v1</dc:identifier>
          <dc:relation>https://figshare.com/articles/dataset/AWWA_C200_Welded_Steel_Water_Pipe_Submittal_and_Inspection_Register_Pack/33833653</dc:relation>
          <dc:rights>CC BY 4.0</dc:rights>
        </oai_dc:dc>
      </metadata>
    </record>
  </GetRecord>
</OAI-PMH>
